VOC Test Report – Gym Remodel

Work #: 205018

Project Summary

Reason for inspection:

  • Recent asbestos abatement during the gym remodel has caused odors and related concerns in the attached fine arts building.

Summary of concerns:

  • None

Summary of recommendations:

  • Establish negative pressure differential between gym and occupied spaces during remodeling and construction.

Observations and Data

FA3:

Summary: No Abnormal Findings

  • tVOC levels @ 0ppb
RH:45.8% Temp:65.4°F CO2: 311 ppm CO: 0 ppm

FA3 (lab area):

Summary: No Abnormal Findings

  • tVOC levels @ 0ppb
RH:45.9% Temp:65.1°F CO2: 328 ppm CO: 0 ppm

Corridor 1:

Summary: No Abnormal Findings

  • tVOC levels @ 0ppb
RH:47.6% Temp:65.2°F CO2: 522 ppm CO: 0 ppm

Stairwell:

Summary: No Abnormal Findings

  • tVOC levels @ 0ppb
RH:51.2% Temp:46.0°F CO2: 548 ppm CO: 0 ppm

Corridor 2:

Summary: No Abnormal Findings

  • tVOC levels @ 0ppb
RH:47.8% Temp:66.6°F CO2: 536 ppm CO: 0 ppm

FA2:

Summary: No Abnormal Findings

  • tVOC levels @ 0ppb
RH:45.4% Temp:66.6°F CO2: 508 ppm CO: 0 ppm

FA1:

Summary: No Abnormal Findings

  • tVOC levels @ 0ppb
RH:47.5% Temp:66.4°F CO2: 444 ppm CO: 0 ppm

FA3A:

Summary: No Abnormal Findings

  • tVOC levels @ 0ppb
RH:44.6% Temp:66.2°F CO2: 352 ppm CO: 0 ppm